Call Us On: +44(0)1279 600 440
Call Us On: +44(0)1279 600 440
Installed in just a few hours, with no need for software or programming, the system was reported to be working out of the box in line with RDN’s 100% factory test guarantee, which is a free service it offers to all its telemetry customers.
Further, if you were to do the analysis, the installation was no doubt “low carbon” as digging an reinstating trenches can be highly carbon intensive, running into many hundreds of Kg of CO2 in particular if concrete has to be cut and reinstated.
Finally, operating on RDN’s VHF Ofcom licenced radio channel also gives the Dairy Owner the reassurance that this critical link and function is legally protected against interference, a problem that can be encountered with UHF licenced free systems operating on similar exposed hilltop locations.
Further, if you were to do the analysis, the installation was no doubt “low carbon” as digging an reinstating trenches can be highly carbon intensive, running into many hundreds of Kg of CO2 in particular if concrete has to be cut and reinstated.